Neoen is a long-term owner and operator of its assets. It has built trusted partnerships with government, industry, and local communities, and is widely recognised for its innovation and delivery track record. The company is a signatory to the Clean Energy Council’s Best Practice Charter and currently contributes over $500,000 in annual community benefit-sharing.
Operation Control Centre
Melbourne, Perth
- All
- Operation
- Construction
- Development
Innovation
Hornsdale Power Reserve, famously built in under 100 days, is a 150MW / 193.5 MWh battery providing grid stability. It saved energy consumers over $150 million in its first 2 years of operations.
Combining expertise in energy management with our physical storage assets, Neoen designed a solution to allow AGL to mimic a grid-scale battery, without having to build or own one.
Delivering clean energy 24/7 – our first baseload contract of 70 MW with BHP combines wind from Goyder South, storage from Blyth Battery and our energy management smarts.
Neoen acknowledges the Traditional Owners of Country throughout Australia and recognises their continuing connection to land, waters and culture.
We pay our respects to their Elders – past, present and emerging.
Celebrating Renewal, 2022
Teho Ropeyarn
A fun, interactive game to discover the different careers in renewable energy, now available for students in years 9-12.
Level 21
570 George Street
Sydney, NSW 2000
Level 6
16 Marcus Clark Street
Canberra, ACT 2601
Lot Fourteen
Cnr North Terrace & Frome Rd
Adelaide, SA 5000
Suite 6A
200 Mary Street
Brisbane
4000
Level 1
53 Salamanca Place
Battery Point, TAS 7004
Level 7
99 King Street
Melbourne, VIC 3000
Level 12
191 St George’s Terrace
Perth, WA 6000